Full Gut, Rebuild with New 2nd Floor

This full gut re-build including a new second floor was started by interior excavation and a new monolithic slab over new plumbing. Once the foundation was set, we removed and re-built the walls and added the second floor. This one will be as beautiful as the views it captures in the coming months.